References E-Mobility with Minol Drive

Electromobility Dec 06, 2022
Man charging an electric car.

Examples of successfully installed Minol Drive Charging infrastructure from our customers' perspective

VISION ONE by Bülow AG in Leinfelden-Echterdingen

VISION ONE: modern working and green mobility

VISION ONE, developed by Bülow AG in Leinfelden-Echterdingen, points the way to the future of work and mobility. Modern and sustainable office buildings and a hotel have been constructed on the 13.500-square-meter site over the past three years. The accompanying underground parking garage offers 450 parking spaces. The infrastructure for electric mobility is being installed for 50 of these spaces, and 24 are already equipped with Minol Drive – powered by GP JOULE CONNECT.

At a glance

  • 450 underground parking spaces
  • First stage: 50 parking spaces equipped with the structural infrastructure for e-mobility
  • 24 parking spaces already equipped with Minol Drive – powered by GP JOULE CONNECT
  • 50 AC charging points including operation, service, billing of charging processes and maintenance of the charging points
  • Ebee AC charging stations with 22 kW charging capacity
  • The second expansion phase will take place.
  • New construction project VISION ONE – Completion of the district: 2022

Learn more about our reference project “VISION ONE: modern working and green mobility”


Heidestrasse Quarter – Recharging for the future

Modern high-rise building with many windows

Driving electric, protecting the environment, and charging at home has never been easier than it is today. We and Taurecon Real Estate Consulting, together with Minol Drive – powered by GP JOULE CONNECT – demonstrate how the housing industry can seize this opportunity and successfully integrate electromobility in the Heidestrasse quarter in Berlin.

At a glance

  • 32 Minol Drive wallboxes
  • 28 with 11 kW and 4 with 22 kW charging capacity
  • Minol Drive module “Operation, Service and Maintenance” for 32 stations with software updates
  • Billing service and load management for 25 stations
  • First construction phase: 2021
  • Completion of the district: End of 2023

Learn more about our reference project “Quartier Heidestrasse in Berlin”