Our service ensures flawless measurement results.

You should commission a system after every installation of heat or cold meters.

Minocal C5 CMF heat meter

Since 2012, commissioning is recommended whenever a heat or cold meter is newly installed or replaced. Commissioning is based on DIN EN 1434-6 and the Technical Guideline K9 of the German National Metrology Institute (PTB TR K9).

Wherever heating costs are billed according to the Heating Costs Ordinance, the owner is responsible for the metering technology. The commissioning of heat and cold meters therefore falls within their area of ​​responsibility. Owners should therefore commission the metering technology at the same time as every installation or calibration replacement.

The commissioning protocol from Brunata Minol allows proof of the proper commissioning of the meters at any time.

Brunata Minol is your competent partner for the commissioning of heat and cold meters.

  • We know the technical basis for legally compliant invoicing.
  • We provide our fitters with optimal training for the installation and commissioning of meters in our in-house training center.
  • We have been a reliable partner to the housing industry for more than 60 years.

More information about the installation of heat and cold meters can be found in the Brunata Minol practical guide.

Legal basis for commissioning

The commissioning of heat and cold meters is provided for in accordance with the European harmonized standard DIN EN 1434-6 and regulated in the Technical Guideline K9 of the Physikalisch-Technische Bundesanstalt (PTB TR K9).

Commissioning according to DIN EN 1434-6

According to the standard DIN EN 1434-6, commissioning is required to ensure that the measuring device accurately records the planned or expected consumption. The same applies to heat meters. This standard specifies commissioning as the final step before heat and cold meters are used. Therefore, proper commissioning is necessary, among other things, to guarantee measurement accuracy and ensure usable measurement data for commercial purposes. If TR K 9 is followed, it can be assumed that the legal requirements for calibration are met.

Technical guideline PTB TR K9

The Technical Guideline K9 (PTB TR K9, Measuring Instruments for Thermal Energy) regulates the practical implementation of DIN EN 1434-6. It was published by the Physikalisch-Technische Bundesanstalt (PTB) on January 12, 21012. Since then, it has been legally binding throughout Germany. The guideline describes:

  • the selection of heat and cold meters
  • the planning and acceptance of the measuring stations
  • the commissioning of the meters

Responsibilities

The following are responsible for the measurement technology – and therefore also for the commissioning of the meters:

  • For billing according to the General Terms and Conditions for District Heating: the heat supplier
  • In the case of billing according to the Heating Costs Ordinance: the building owner or his agent.

The service of Brunata Minol

Brunata Minol offers commissioning according to PTB TR K9 for these meters:

  • Heat meter
  • cold meter
  • combined heat and cold meters

Trained technicians inspect the meter and its installation and prepare a detailed report. The commissioning process includes:

  • Recording the measuring point data
  • Recording the measuring device data
  • Verification of compliance with all assembly instructions, including sealing.
  • Function check of the counter
  • Date and signature of the examiner

The commissioning protocols are provided to the owner. In addition, they are electronically archived at Brunata Minol for at least 10 years. This ensures that the proper commissioning of the meters can be verified at any time.

Answers to the most frequently asked questions

Why is commissioning so important?

Commissioning serves to ensure the correct selection of devices and the proper installation of components. This prevents inaccurate measurements and legally questionable billing. According to the PTB TR K9 technical guideline, heat and cold meters only operate accurately and consistently if...

  • During the plant planning, a correct selection of measuring instruments for the approved area of ​​application was carried out.
  • the measuring point was installed in accordance with the applicable requirements and
  • The measuring device was checked for correct installation and complete function during commissioning.

For which meters is commissioning mandatory?

For newly installed or replaced heat or cold meters, commissioning according to PTB TR K9 is recommended. This applies equally to main, group, and user meters.

When is the right time for commissioning?

Heat and cold meters should be put into operation immediately after installation or calibration replacement.